INDUSTRIAL - COMMERCIAL - HOTELS - OFFICES
TECHNOLOGICAL AND INDUSTRIAL PARK IN EUROPE - MADRID - SPAIN
Key Development Highlights – Upcoming Project PLOT 27-14 (UE-2. SECTOR 5 “Tertiary-Industrial”) PAU 5 PARLA – MADRID – SPAIN – EU
Operational Urbanization Phase:
This industrial development in Madrid is currently in the site preparation stage. It focuses on the development and sale of industrial and logistics spaces, allowing technical customization and layout adjustments prior to construction, ensuring the infrastructure aligns with the client’s specific operational requirements.
Structure:
The initial design comprises a total built scheme of industrial warehouse spaces with different surface areas, engineered to provide a versatile operational base without predefined internal subdivision into independent units.
Logistics Unification Capacity:
The design allows for the combination of built surfaces into larger continuous operational areas, consolidating up to 4,087.20 m². This configuration is suitable for operators requiring a unified facility optimized for inventory and goods flow.
Scalable Infrastructure:
The project provides a real estate solution adaptable to business volume, from partial occupation to the use of the entire industrial facility under a concept of technical efficiency.
Location & Surroundings:
Land located in the Cerro de la Cantueña district, north of Parla’s town center. This area within the PAU-5 development is characterized by its large-scale logistics and industrial activity, hosting established operators in the sector. The site benefits from planned access to the M-419 and is located in close proximity to the future Parla Norte railway station.
Technical Specifications:
Structure & Walls: Steel frame structure. Exterior walls constructed with smooth precast concrete; interior partitions in cellular (aerated) concrete.
Roofing: Double-skin trapezoidal metal sheeting with white finish, incorporating an air chamber and rock wool thermal insulation.
Flooring & Finishes: Polished concrete flooring in warehouse areas. Office and restroom areas finished with porcelain tiles, including granite staircases.
Fittings & Lighting: Aluminum windows and lacquered steel exterior doors. Full LED lighting system installed throughout the facility.
Clear Height: 5.50 meters.
Disclaimer: This document is provided for commercial information purposes only and is non-binding. All details are subject to modification due to construction requirements, licensing processes, or decisions made by the Project Management team.
PAU-5 covers a total area of 571.94 Ha, divided between 444.20 Ha to the West of the municipality (Sector 5) and 127.74 Ha designated as General Systems, which are intended for Green Zones and Facilities (Educational, Sports…) of public and social interest.

UPCOMING HOTEL DEVELOPMENT SALE TRANSACTION MANAGED BY FOUNDING PARTNERS IN EUROPE
Investment Opportunity: SAU12 Europe Aparthotel
Corporate accommodation in Spain’s leading logistics and industrial hub.
Project Overview Sale transaction of an upcoming hotel development located in Illescas (Spain). A 160-unit aparthotel specifically designed to capture the sustained year-round corporate demand in the region.
Key Specifications
- Capacity: 160 units across two three-story buildings.
- Plot Size: 37,382 ft² (3.472,98 m²).
- Built Area: 50,512 ft² (4,693 m²).
- Parking: 50 underground spaces; 16.838 ft² (1.564,38 m²).
Strategic Location & Connectivity Located in Sector SAU12, an area surrounded by global logistics, industrial, and technology multinationals.
- Connectivity: Direct access to Madrid via A-42; high-capacity routes AP-41 & CM-41 for logistics and corporate traffic.
Execution Timeline
- Phase 1 (80 units): Start 2026 – Completion Dec 2028.
- Phase 2 (80 units): Start 2027 – Completion Dec 2028.
Management & Status Commercial and strategic management conducted by the Founding Partners on behalf of the ownership. Currently in its pre-construction phase, subject to technical planning and licensing.
Information Notice: This document is for commercial information purposes only and is non-binding. All details are subject to change due to construction requirements, licensing, or project management decisions.
PRISVEM, LLC – Commercial Sector Land Project (Conceptual Phase) Lee County, Florida - Cape Coral | Zoning: Commercial Corridor (CC)
Legal Disclaimer: This rendering is an artistic representation for conceptual purposes only. All information, including dimensions, materials, and finishes, is subject to change without notice due to construction requirements, licensing, or project management decisions. This document does not constitute a binding contract.
This real estate asset is defined by its high operational efficiency and strategic integration within the logistics ecosystem of Lee County, Florida. The development is designed to meet the rigorous technical standards for durability and safety required in the region.
Regional Connectivity and Strategic Logistics
The location serves as a key communications hub, facilitating operations at local, regional, and international scales:
- Airport Infrastructure: Situated 30 minutes from Southwest Florida International Airport (RSW), the region’s primary hub for air travel and cargo.
- High-Capacity Highway Network: Immediate access to Interstate 75 (I-75), the vital artery connecting the major economic centres of Tampa and Miami.
- Regional Transport Corridors: Strategic proximity to US-41 (Tamiami Trail) and direct connection to local commercial corridors such as Del Prado Blvd and Pine Island Rd.
- Multimodal Infrastructure: The sector benefits from proximity to distribution centres linked to the regional rail network and Gulf Coast cargo ports.
- “Through-lot” Configuration: The parcel allows for independent logistical flow with access via two different streets, optimising loading and unloading manoeuvrability.
Zoning: Commercial Corridor (CC)
The Commercial Corridor (CC) land classification allows for high-density development. This versatile zoning supports a wide range of business activities, from corporate headquarters and tech offices to light industrial services and distribution centres.
Construction and Design Specifications
- Construction System: Use of precast concrete panels. This system ensures structural precision, rapid on-site assembly, and reduced construction timelines.
- Architectural Lighting: The design features high-security glass enclosures to maximise natural light within the workspaces.
- Materials and Finishes:
- Interiors defined by a neutral colour palette.
- Polished concrete flooring in operational areas to ensure high durability and low maintenance.
- Exterior and Infrastructure: Environment designed under mineral sustainability criteria, integrating the mandatory parking spaces required by Cape Coral municipal regulations.
Legal Disclaimer: This document and the accompanying visual representations are for conceptual and illustrative purposes only. All commercial information, including dimensions, specifications, materials, and finishes, is subject to modification based on construction requirements, regulatory licensing, or site management decisions. Such details may change without prior notice and do not constitute a binding offer or form part of any contractual agreement.
Tecnoalcalá Technological Building Project - the Alcalá University Science and Technology Park
This project comprises a technological-use building with a total built area of 3,016 m², divided into four independent modules (units) of 754 m² each. The property is situated within the Alcalá University Science and Technology Park (Tecnoalcalá), an enclave designed to accommodate innovation activities and value-added services in the Community of Madrid.
Location and Connectivity
The site occupies a strategic position within the Henares Corridor axis:
- Road Infrastructure: Direct access to the R-2 toll motorway (toll highway) and the A-2 motorway (highway), ensuring efficient links with major logistics and business hubs.
- Rail Infrastructure: Close to the Civis rail service, which connects the area to Chamartín Station in approximately 25 minutes, facilitating the transit of technical personnel (staff).
- Institutional Setting: The building is integrated into the University Campus. This location was designed to encourage the synergies typical of a science park, providing proximity to the University of Alcalá’s research centres (centers), technological facilities, and faculty departments.
Technical Specifications and Finishes
The building’s design and materials were chosen to guarantee durability and an institutional image appropriate for its technical purpose:
- Natural Stone Façade (Facade): A key feature of the project was the specific investment in a natural stone façade. This structural solution was decisive in giving the property the technological identity required by the park, ensuring a robust aesthetic and superior long-term maintenance (preservation).
- Building Envelope and Insulation: Cellular concrete walls and a technical roof with double-skin (double-layer) metal cladding and thermal insulation. This combination ensures optimal insulation against both heat and cold, providing a comfortable internal environment and enhanced energy efficiency.
- Space Distribution (per 754 m² module):
- Ground Floor (532.40 m²): Operational space with polished concrete flooring.
- Office Area (221.78 m²): Versatile floor space with high-specification (high-end) finishes.
- High-Quality Interior Materials:
- Professional Areas: Office floors (flooring) and staircases are finished in natural granite.
- Service Areas: Bathrooms (restrooms) are fully clad in natural granite or marble.
- Joinery (Millwork) and Fittings: Aluminium (aluminum) windows, timber (wood) internal doors, and a cohesive technical aesthetic across the entire development.
This asset represents a key infrastructure within the regional technology park network, designed to provide a functional, resilient, and highly professional working environment.
ISAAC PERAL INDUSTRIAL PROJECT 20-21
Isaac Peral 20-21 Project – Rompecubas Industrial Estate (Industrial Park)
The project consists of two industrial units situated at 20-21 Isaac Peral Street (Plot 9-2), located within the Rompecubas Industrial Estate (Industrial Park) in Valdemoro, Madrid.
Location and Communications
The property is situated in a strategic enclave in southern Madrid, with direct access at kilometre 29 of the A-4 (South Motorway/Highway). This location provides an immediate connection to the capital and the rest of the national road network via the M-506 and M-404. Additionally, the estate has direct access to the R-4 (Toll Motorway/Highway), providing an alternative route towards the M-50 and M-45 orbital roads.
Regarding public transport and services, the estate has connections via bus lines that link to the C-3 Cercanías Renfe (commuter rail) line. The surrounding area features public services such as the Community of Madrid Fire Station and various municipal offices.
Technical Specifications (Memoria de Calidades)
The following are the technical specifications of the project:
- Structure: Steel frame with fireproof (fire retardant) treatment.
- Facades and Enclosures: Painted precast cellular concrete walls. The main facade is finished in white marble chippings.
- Roof: Ceiling with fibreglass (fiberglass) thermal insulation, air chamber, and double metal sheeting.
- Dimensions and Flooring: The units have a height of 8 metres (approx. 26 ft) and a polished concrete slab (floor).
- Office and Toilet (Restroom) Finishes:
- Bathrooms tiled to the ceiling in natural granite.
- Granite staircases.
- Internal wooden joinery (woodwork) and aluminium (aluminum) windows.
- Folding exterior “Pegaso” steel sheet doors.
- Facilities (Utilities): Hot water system via electric boiler (water heater) and complete lighting in office and toilet (restroom) areas.
ISAAC PERAL 20
ISAAC PERAL 21
PARKING SPACE IN GRAN VÍA PEDESTRIAN ZONE, MAJADAHONDA
Buenavista 3 St. – Basement Level -1
MAJADAHONDA – MADRID – SPAIN
This parking space, located in a pedestrian area with lift access, has been subject to both rental and sales transactions.
Its direct exit eliminates the need for complex vehicle manoeuvres, providing easy access through simple forward and reverse movement.
The width of the pedestrian street has helped simplify both the entrance to the building and the garage area.
BUZANCA 8 PROJECT
VALDEMORO – MADRID – ESPAÑA – EU
Buzanca 8 Project – Valmor Industrial Estate (Industrial Park)
The Buzanca 8 Project consists of the development and construction of 1,545.7 m² (approx. 16,638 sq ft) of floor space and 6 parking spaces (parking spots) on an industrial plot of 2,576 m² located at 8 Buzanca Street. Valmor Industrial Estate. Valdemoro – Madrid – Spain.
Location and Communications
The project’s strategic location in southern Madrid provides access to the following infrastructure:
- Main Road Networks: Direct connection to the A-4 (South Motorway/Highway) 26 km from central Madrid, and access to the R-4 (Toll Motorway/Highway).
- Regional Routes: Proximity to the M-404 (linking Navalcarnero and Villarejo de Salvanés) and the M-506 (linking Móstoles and San Martín de la Vega).
- Public Transport: Access to the C-3 Cercanías Renfe commuter rail line (Valdemoro-Atocha in 35 minutes) via bus lines located less than 1 km from the site.
Industrial Context
The Valmor Industrial Estate is a consolidated area with a long-standing industrial history. It hosts companies across diverse sectors, such as textiles and metallurgy, within a municipality of over 78,000 inhabitants.
Specifications (Memoria de Calidades)
- Structure and Enclosures:
- Height: 8 m (approx. 26 ft).
- Roof: Double galvanised (galvanized) steel sheeting with thermal insulation and an air chamber.
- Main Facade: Natural stone and painted concrete.
- Windows: Aluminium (aluminum).
- Internal Doors: Wood.
- Flooring and Finishes:
- Warehouse Floor: Polished concrete slab and painted concrete walls.
- Offices and Toilets (Restrooms): Natural granite flooring.
- Staircases: Natural granite.
- Bathrooms: Fully tiled in granite.
- Facilities (Utilities):
- Lighting: Complete system installed in the warehouse, offices, and bathrooms.